New in Basecamp 3: An all-new Schedule design

Big update today! Starting right now, Basecamp 3 customers will see an entirely new design when they flip over to the Schedule screen in any team, project, or HQ.

The schedule used to look like this…

BTW, this is the actual schedule for our all-new REWORK Podcast.

It was colorful, and it provided a nice overview if you only had a few events, but it quickly got out of hand if you had a lot of events or to-dos mixed in. And when you wanted to get in there and see exactly what was happening next week, or if there was anything on the schedule this Friday, it fell down pretty hard.

So we fixed it. And more!

And here’s the new schedule…

At the top you have a grid showing the current month + the next month. You can page through the months using the arrows top left and right. Every event or to-do that’s due on a given day is represented by a dot. Three events, three dots. If there are no dots, there’s nothing on the schedule for that day. Now you can see gaps and openings and weekly overviews — something that wasn’t possible with the previous design.

A LIGHT project on the left, a HEAVY project on the right.

Below the grid is a straightforward agenda view. Events are clearly grouped by days (if there’s anything on a given day). And you can jump around the agenda view by clicking around in the calendar above. Want to see what’s happening next Wednesday? One click and it pops right to the top of the agenda view. This was something you couldn’t do before.

Events (or to-dos) that span multiple days are shown in a couple ways. First, if they’re on the current day, they show an “Until” right under the event. And then, they’re shown in light grey at the top of subsequent days. They’re also repeated on every future day so you can get a very direct sense of what’s happening on a given day. You couldn’t see this in the previous design because they were only shown at the top of a month, and not on individual days where the event occurred.

See how “KA Sabbatical” says “Until August 27th” below it at the top? Now you know KA will be out until the 27th. And on the 24th you’ll also see “KA Sabbatical” at the top along with “JS Out” “AB Out” and “CJ Out” — the other long-running events that continue that day.

One of the really nice benefits of this is that you can see overlapping long-running events. In the example below, you’ll see Tom is out on sabbatical, and then “SU” starts his sabbatical on the 23rd. Now from June 24th — 30th you’ll see they are both on sabbatical. This was non-obvious in the previous design. Now it’s clear as day.

Here’s another before and after. Before on the left, after on the right…

← Before ……………………….. After →

You’ll notice the previous design (on the left) doesn’t show that KA, JS, AB, and CJ are even out on the 24th— you’d have to go back up to the top of that month to figure that out. Forget to do that, or not even realize you have to, and you’re missing out on important information. This is fixed in the new design.

Lastly, we’ve pulled this design over to two more places: “My Schedule” and the “What’s coming up” report. An example:

This report shows what’s coming up across all teams and projects across your entire account. You can see we have a lot scheduled in August, but things begin to lighten up towards the end of September.

No Comments, Be The First!